Gebr. Renggli AG - Project Security Through Planning and Execution From a Single Source
Gebr. Renggli AG is one of the leading suppliers of thermoplastic products in medical technology. IE Plast completed the extension for injection moulding and assembly under clean room conditions in just 9 months.

Project Security Through Planning and Execution from a Single Source
Project
Construction planning and execution of an extension for injection molding and assembly under cleanroom conditions
Client
Gebr. Renggli AG
Key Data
Working Together for Project Success
Services provided by IE Group
- Construction planning and execution of an extension
- 9 months from groundbreaking to readiness for purchase after OQ
- Integration of injection molding shop and assembly room
- Coordination of operational and construction measures during ongoing operation
- Meeting the high hygiene requirements in medical technology
Challenges & Solutions
Hygiene Requirements
Ongoing Operation
GMP qualification & ISO 7
The Project in Detail
The Swiss family-owned company Gebr. Renggli AG is one of the leading providers of thermoplastic plastic products in the field of medical technology. To decouple medical-technology plastics production from the manufacturing of industrial components, IE Plast was commissioned with the planning and execution of a production building with an integrated cleanroom. Thanks to stringent project management and our industry-specific expertise, a modern industrial construction project was realized at the Schaffhausen site – one that fully meets the exceptionally high hygiene requirements in plastics processing.
The Challenge
Adhering to the highest hygiene requirements for production under cleanroom conditions plays an increasingly important role in plastics processing. When planning industrial buildings with an integrated cleanroom, all measures must also consider ongoing operations. A key challenge was addressing the complex interfaces between architecture, structural engineering and the individual building services disciplines. Always in line with the principle: Design to Budget.To ensure all expansion stages, a master plan had to be developed. In addition, continuous coordination with the competent authorities was essential to secure approval for the production hall.
Key Success factors
IE Plast benefits from the extensive experience of its experts in medical technology—particularly in planning, execution and qualification of cleanrooms. However, the close involvement of Gebr. Renggli AG employees throughout the planning phase was decisive for the project’s success.Across a series of workshops, various operational concepts were developed, verified, optimized and evaluated using benefit analyses in an iterative process. This structured approach enabled all stakeholders to contribute to the final solution.

Deepen Your Knowledge
Discover further details in our Project Insight.





