Otto Fischer AG - Construction planning and execution of an extension with an energy concept.

Otto Fischer AG is a long-established electrical wholesaler. As general contractor, IE Technology planned and delivered an extension with an intelligent energy concept – doubling warehouse capacity and meeting the Minergie standard.

Extension and energy concept – planning and execution

Project

Planning and execution of refurbishment measures as general contractor and architect, plus operations planning.

Client

Otto Fischer AG

Key Data

Planning and Execution
IE Technology
Planning and Construction Period
3 years
Floor area
25,000 m²
SIA volume
98,000 m³
Energy Demand
863 MWh/a
Investment Volume
CHF 20 million

Working Together for Project Success

Services provided by IE Group

  • Two additional storeys added to the industrial building while operations continued
  • Warehouse capacity doubled
  • High energy efficiency through close coordination of architecture, energy supply and building services
  • Automation to speed up logistics and operational processes
  • Efficiency gains through streamlined processes
“Thanks to the close coordination of energy supply, building services and the façade upgrade, the building is highly energy efficient and meets the demanding Swiss Minergie standard – both for the building envelope and heat generation.”
Roger Altenburger
Roger Altenburger
CEO, Otto Fischer AG

Challenges & Solutions

No room for expansion

Warehouse capacity doubled by adding two storeys while operations continued.

Inefficient processes

Automation introduced to accelerate logistics and operational processes.

Minergie refurbishment - CO₂ reduction

Integrated concept covering architecture, building services, energy sources and façade refurbishment – Minergie standard with significantly lower emissions and operating costs.

The Project in Detail

Otto Fischer AG is a long-established electrical wholesaler that has grown steadily over many years. However, the industrial buildings dating back to the 1970s could no longer meet the demands of modern order-picking. As space on the site became increasingly tight, operational processes grew less efficient.

IE Technology was therefore commissioned as general contractor to extend the existing industrial building while operations continued. The project included adding a full additional storey and a logistics extension. In addition, the building envelope was upgraded for energy efficiency, processes were streamlined through automation, and the existing floor space was used to best effect.

The Challenge

Otto Fischer AG’s site could no longer be expanded. However, the excellent transport links in Zurich were a key reason for staying at the existing location. This called for smart solutions to use the available space in the commercial building more effectively. The existing oil heating system was not only energy-inefficient – it also took up valuable space. In addition, the current logistics processes involved an above-average number of work steps and were largely manual.

Key Success Factors

IE Technology’s experts analysed all operational and logistics processes to eliminate bottlenecks with a holistically planned overall concept. When automating work steps and closely coordinating energy supply, building services and the façade refurbishment, architects, engineers, logistics specialists and energy experts worked hand in hand throughout. The result is an innovative and economical industrial building that benefits both the company and the environment – more space, lower energy demand and CO₂ emissions approaching zero.

Download

Deepen Your Knowledge

Discover further details in our Project Insight.

Let's lay the foundation for your project

Every successful journey starts with a clear direction. Let’s align on your goals and establish the strategic basis for a successful project.