SCHOTT Pharma AG - Doubling cleanroom production
In St. Gallen, SCHOTT AG produces prefillable syringes made of high-quality polymer for the global pharmaceutical industry. As a general contractor, IE Plast doubled cleanroom production in record time.

Doubling cleanroom production
Project
Holistic planning and execution of an expansion of cleanroom production as general contractor.
Client
SCHOTT Switzerland AG
Key Data
Working Together for Project Success
Services provided by IE Group
- Holistic cleanroom planning including a protection concept and phased execution of the construction works
- Doubling cleanroom production in record time
- Increased productivity during ongoing cleanroom operations
- IE methodology to ensure on-time completion
- Many years of experience in industrial construction and cleanroom planning
Challenges & Solutions
Structural works
Ongoing operations
Ambitious schedule
The Project in Detail
Doubling cleanroom production in record time — the challenge
As the production lines on the lower floor of the industrial building could no longer meet demand, cleanroom production was to be expanded to the upper floor. In addition to the very limited space available, the building’s load capacity and the existing ceiling system were not suitable to carry the additional loads from the cleanroom and building services.
At the same time, strict hygiene standards had to be maintained and ongoing production could not be interrupted.
Expanding cleanroom production during ongoing operations – the success factors
1. Holistic cleanroom planning to reduce execution time
Three core capabilities were essential for delivering this ambitious cleanroom expansion: comprehensive knowledge of industrial production in plastics and life science environments, in-depth expertise in cleanrooms, GMP and building services engineering, and experience of executing complex projects during ongoing operations – criteria that IE Plast fulfilled in full.
2. Sophisticated protection concept and phased execution
The existing structure alone did not allow heavy production lines to be installed on the upper level or the additional loads to be transferred safely through the ceiling system. Therefore, a parallel steel support structure including a technical platform and around 800 reinforcement points was installed to increase load capacity. In addition, façade works and a complete refurbishment of the building envelope were required.
To avoid contamination and prevent operational disruption, IE Plast also developed a robust protection concept and a clearly phased delivery plan for the entire construction programme.
3. Immediate productivity increase through single-source planning and execution
While construction was ongoing, a cleanroom cell including provisional utilities was completed. This allowed a production line to be installed in stages and additional volumes to be absorbed early – enabling parallel installation and faster ramp-up.
4. IE methodology for maximum planning certainty
Drawing on many years of experience in industrial construction and cleanroom planning, IE Plast applied a methodical planning approach – “from the inside out”. In close coordination with SCHOTT AG, all planned measures were aligned and delivered on time, while consistently meeting requirements for cost, schedule, quality and function.
5. Close collaboration to manage complexity
In an intensive dialogue between experts from IE Plast and SCHOTT AG, solutions were developed and implemented quickly. High availability of the planning teams and short decision-making paths made a significant contribution to the project’s success.