Food

Emmi Fondue AG – Hygiene Concept and Planning of an Extension

Emmi Fondue AG is the largest producer of processed cheese in Switzerland and a global leader in ready-made fondue mixes. IE Food planned and executed a production conversion and new building featuring a high-quality room protection concept and an optimized ventilation system.

Hygiene Concept and Planning of an Extension

Project

Planning and execution of a plant conversion and new construction for a production expansion

Client

Emmi Fondue AG

Key Data

Planning & Execution
IE Food
Construction Period
11 months
New Building Area (GFA)
5,400 m²
Investment Volume
CHF 15.7 million
Restructuring Investment Volume
CHF 4.8 million

Working Together for Project Success

Services provided by IE Group

  • Planning and execution of the business conversion and new production expansion
  • Development of a new production layout
  • Tailored hygiene concept
  • 11 months from production layout to completion
  • Introduction of a high-quality room protection concept for easy cleaning of production areas
  • Perfectly aligned building technology systems
  • Optimal coordination of operational, construction and building services planning
  • Integration of a new ventilation concept for a pleasant working environment
  • Optimally designed concept to meet high standards in production hygiene

Challenges & Solutions

Site Merger

Complete delivery of the construction project across all planning phases with seamless coordination.

Hygiene Standards

Tailored hygiene and material flow concept with innovative protective measures.

Ventilation & Room protection

Production-specific ventilation concept and integrated room protection system — perfectly coordinated building technology for hygiene and workplace comfort.

The Project in Detail

Emmi Fondue AG is the largest producer of processed cheese in Switzerland and a world leader in ready-made fondue mixes. At the Thun and Langnau sites alone, the company produces 13,400 tons of various cheese products annually. To remain competitive, potential synergies were identified and planned investments in Emmental were evaluated. During ongoing operations, IE Food took over the full planning and execution of the renovation of existing industrial buildings as the general contractor. IE specialists were also commissioned to build the new production extension. This included realigning the production layout to better meet hygiene standards and increase the profitability of food production.

The Challenge

The main challenge was merging the two production sites, located about 30 kilometers apart, while implementing the construction project during ongoing operations. IE Food was tasked with planning the entire renovation, building the new production extension, and developing the building technology. To comply with hygiene requirements in the food industry, the integrated construction and logistics planning had to consider all hygiene zones while not only take into account all hygiene levels, but also include a room protection and ventilation concept.

Key Success Factors

IE Food specialists delivered the entire construction project across all planning phases. The result is a modern new building featuring a tailored hygiene and material flow concept that exceeds the high demands of the food industry. The conversion of the existing industrial buildings also enabled efficient operations and manufacturing processes thanks to a perfectly coordinated production layout. Innovative protective measures ensure optimal cleaning, and a dedicated ventilation concept guarantees consistently pleasant working conditions in food production.

Download

Deepen Your Knowledge

Discover further details in our Project Insight.

Let's lay the foundation for your project

Every successful journey starts with a clear direction. Let’s align on your goals and establish the strategic basis for a successful project.