Josef Müller Gemüse AG – Planning and Construction of an Extension for Food Production
Josef Müller Gemüse AG processes fruit and vegetables into high‑quality convenience food. As the general contractor, IE Food expanded the industrial building during ongoing operations and doubled the production area.

Production Building Extension
Project
General planning and execution of an extension for food production during ongoing operations
Client
Josef Müller Gemüse AG
Key Data
Working Together for Project Success
Services provided by IE Group
- Planning and execution of the production building extension
- Optimizing all operational and logistics processes
- Optimization: room temperatures and humidity conditions through improved insulation and cooling
- Staging: coordinating the full construction process to ensure seamless integration during ongoing operations
- Doubling: expanding the entire production area
Challenges & Solutions
Consistently implement the hygienic requirements of food production in the extension.
Realign all operational logistics when doubling the production area
The Project in Detail
Josef Müller Gemüse AG in Hünenberg processes fruit and vegetables into high‑quality convenience food. These products are delivered to major distributors and customers throughout Europe. The owner‑managed company is a wholly owned subsidiary of the Spanish GAC Group, one of Europe’s largest agricultural and food companies. To safeguard its strong position in the Swiss vegetable market and ensure long‑term success, IE Food was commissioned as general planner and general contractor. During ongoing operations, the existing industrial building was to be expanded and the operational and logistics processes redesigned – with the goals of increasing efficiency, improving hygiene in food production, and doubling the production area.
The Challenge
The new extension had to be built while production continued. The aim was to keep disruptions to food manufacturing as low as possible. This required optimal communication between IE Food’s experts and all stakeholders to ensure precise coordination throughout the project. When redesigning the production processes, the cold chain could not be interrupted at any point. Additionally, strict hygiene requirements according to the Codex Alimentarius and international standards IFS and ISO 9001:2000 had to be met in full.
Key Success Factors
Thanks to IE Food’s holistic planning, the extension was seamlessly connected to the existing industrial building, more than doubling the production area. To ensure a smooth transition from the old to the new facility, relocation was carried out step by step. This also further improved the hygiene concept across all manufacturing processes. Beyond production, the warehouses, overall infrastructure, and production‑related offices were fully redesigned. Bright, generously sized daylight openings significantly improved the working environment.

Deepen Your Knowledge
Discover further details in our Project Insight.



