Rampini Construction SA – Construction and Operational Planning of a New Commercial Building
Rampini Construction is one of the most efficient providers of building and civil engineering services in western Switzerland. IE handled construction planning and process‑oriented operational planning for efficient, sustainable industrial construction.

Threefold Sustainable: Economically, Socially and Ecologically
Project
Planning and execution of a central workshop center
Client
Rampini Construction SA
Key Data
Working Together for Project Success
Services provided by IE Group
- Construction and operational planning
- Implementation and architectural management
- Efficient: structured operating processes and environmentally friendly use of resources
- Modular: building designed to accommodate future expansions
- Sustainable: environmentally friendly energy concept and insulation systems
- Consistent: interconnected ecological, social and economic objectives
- Attractive: architectural design creates a performance‑enhancing work environment
Challenges & Solutions
Bringing Ecological, Social and Economic Sustainability Goals into Alignment
Process‑Oriented Operational Planning for an Efficient Central Workshop Center
Modular Building Design for Cost‑Effective Future Expansions
The Project in Detail
Rampini Construction is one of the leading providers of building and civil engineering services in western Switzerland. To improve operational processes and reduce energy costs, the company sought to bundle operational logistics at a central location. The experts from IE took over construction planning and process‑oriented operational planning. The result is a carefully designed industrial building that sets new benchmarks in efficiency and sustainability.
The Challenge
On behalf of the internationally active Rampini Construction SA, IE planned and constructed a multifunctional building complex together with the architecture firm Archidea. Key parameters of the overall planning included the combination of ecological, social, and economic goals. Based on a holistic usage concept, the new facility was designed to ensure sustainable construction principles and long‑term energy concepts.
Key Success Factors
In close collaboration with general planner and architect Archidea, the experts from IE developed a coherent operational and spatial concept with multifunctional building sections that can be allocated to different business areas. The three‑story industrial building with a total area of 4,500 m² comprises:
- Ground floor: warehouse with twenty parking spaces, a production area including a workshop, and smaller rooms for contractors
- First floor: logistics area, office space for the architecture firm, and an apartment
- Second floor: office space for Rampini Construction SA and a smaller storage room
A key element of the new building was the development of an energy concept consisting of large‑scale solar modules installed on the roof and southwest façade, combined with thermal equipment for heating and hot water. This holistic use of sustainable energy sources enabled the building to achieve the desired Minergie certification.

Deepen Your Knowledge
Discover further details in our Project Insight.




